logo spacer
Ελληνικά spacer
spacer spacer
arrow_left
arrow_right
Engineering Engineering


Project Management
Basic Design
Design Activities
Planning and scheduling
Quality Assurance & Control
Cost Estimating and Control
Detailed Engineering Design
Permit Issuance
Construction management
Procurement
Testing - Final Receipt
Operation and Maintenance
box_tl spacer box_tr
spacer

Necessary Documentation

In order for the Certification procedure to proceed, a certification application is required.

During the inspection the followings are checked:

  • Authorization of Operation of Company and accompanying Documents
  • Other authorizations that are required
  • Organisational Structure / Organization chart
  • Quality Policy
  • Handbook of Quality
  • Activities
  • Objectives of Quality
  • Procedures and Directives
  • Exterior Documents (eg Relative Legislation)
  • Files
  • Time of Issuance and Validity of Certificate


Provided that the Inspection of Evaluation of Quality System is successfully completed and exists a positive proposal from the Team of Inspectors, the certificates is issued in a short time (no bigger than five weekdays).

The certificate is valid for three years and for this period is supported by two annual Inspections of Monitoring.





spacer
box_bl spacer box_br




Newsletter
Leave your mail here.

|
spacer
logo_small

Zip Code 55510, PO Box 8801
Phone :+0302310 867 575
Fax :+030 2310 887 226
spacer
spacer
iso
tuv_hellas
iso14001
CONTEC A.E. has developed and implements a Quality Control System, Environment, Safety and Health certified by TUV HELLAS - TUV NORD (ISO 9001: 2015, ISO 14001: 2015, ISO 45001: 2018).


CONTEC has defined and controls the necessary processes to ensure that the services are performed according to customers? requirements.

slogan



 Login  Forgotten password 

active³ 5.0 · © 2000 - 2014 IPS Ltd · Disclaimer