logo spacer
Ελληνικά spacer
spacer spacer
arrow_left
arrow_right
Engineering Engineering


Project Management
Basic Design
Design Activities
Planning and scheduling
Quality Assurance & Control
Cost Estimating and Control
Detailed Engineering Design
Permit Issuance
Construction management
Procurement
Testing - Final Receipt
Operation and Maintenance
box_tl spacer box_tr
spacer

Construction of Low Sulphur Diesel Line 8

CLIENT: HELPE SA
CONTRACTOR: MAK ATE
LOCATION: THESSALONIKI
TITLE: CONSTRUCTION OF LOW SULPHUR DIESEL LINE 8"

DESCRIPTION: Preparation of Civil Eng. & Mechanical Studies.





spacer
box_bl spacer box_br




Newsletter
Leave your mail here.

|
spacer
logo_small

Zip Code 55510, PO Box 8801
Phone :+0302310 867 575
Fax :+030 2310 887 226
spacer
spacer
iso
tuv_hellas
iso14001
CONTEC A.E. has developed and implements a Quality Control System, Environment, Safety and Health certified by TUV HELLAS - TUV NORD (ISO 9001: 2015, ISO 14001: 2015, ISO 45001: 2018).


CONTEC has defined and controls the necessary processes to ensure that the services are performed according to customers? requirements.

slogan



 Login  Forgotten password 

active³ 5.0 · © 2000 - 2014 IPS Ltd · Disclaimer